AutomotiveRobotics & Physical AI
F.02 Contributed to the Production of 30,000 Cars at BMW
BMW Group (Plant Spartanburg)
Figure deployed its Figure 02 humanoid robot at BMW Group Plant Spartanburg for an 11-month trial performing sheet-metal loading on an active assembly line, running 10-hour shifts Monday-Friday. Over the deployment, the robot loaded 90,000+ parts, logged 1,250+ hours of runtime, and contributed to the production of 30,000+ X3 vehicles, with a target cycle time of 84 seconds and placement accuracy goal of 99% per shift.